West Pyote Station – Energy Transfer Facility

House architecture design in Los Angeles, CA

House architecture design in Los Angeles, CA

We executed a turnkey lump sum project for the full upgrade of the West Pyote Station facility. Our scope included civil, structural, mechanical, piping, electrical, and instrumentation work. This involved installation of deep foundations (helical piles and sonotubes), construction of reinforced concrete foundations, and fabrication and erection of pipe rack steel. On the mechanical side, we handled the setting of owner-furnished equipment including knockout drums, pumps, and blowcases, as well as the relocation and reinstallation of an existing flare system. We also fabricated and installed all interconnecting piping systems, including multiple tie-ins to existing infrastructure. Electrical and instrumentation scope included installation of power distribution for equipment, cable tray systems, H2S perimeter safety monitoring, and termination of control devices.

Date

Location

West Pyote Station – Energy Transfer Facility

Service

Turnkey General Construction

House Architecture - Construktion X Framer Template

More Information About The Project

We delivered a fully functional and mechanically complete facility upgrade under a lump sum turnkey contract for Energy Transfer. The project included critical operations such as the dismantling, transport, and reinstallation of a 45-foot flare system, installation of new process piping, and integration of safety and control systems across the site.

Our team managed all disciplines and subcontractors, ensuring coordination across civil, mechanical, and electrical scopes while maintaining schedule compliance. The project was successfully completed within a strict deadline, meeting all operational and construction requirements for the upgraded station.

Project gallery

These images capture the successful upgrade of the West Pyote Station facility under a turnkey lump sum contract for Energy Transfer. The gallery highlights the progression of civil, structural, mechanical, piping, electrical, and instrumentation work, including deep foundations, reinforced concrete, pipe rack steel, flare system relocation, equipment setting, and process piping installation. Each phase reflects PARPAL’s ability to coordinate multiple disciplines and deliver complex industrial projects with precision, safety, and schedule compliance.

Image 1 - Construktion X Framer Template
Image 2 - Construktion X Framer Template
Image 3 - Construktion X Framer Template
Image 4 - Construktion X Framer Template
Let's Work Together - Construktion X Framer Template

Let’s Work Together
Build with a Team Focused on Speed, Precision, and Execution.

Delivering Practical Solutions to Complex Projects

Where Engineering Meets Construction

Contact

Headquarters:

6817 W County Rd 107, Midland, TX 79706


Corporate Office:

21 Waterway Ave, Suite 300, The Woodlands, TX 77380

info@parpalco.com


+1 (432) 214-2442


Copyright © PARPAL LLC - Powered by Framer

Let's Work Together - Construktion X Framer Template

Let’s Work Together
Build with a Team Focused on Speed, Precision, and Execution.

Delivering Practical Solutions to Complex Projects

Where Engineering Meets Construction

Contact

Headquarters:

6817 W County Rd 107, Midland, TX 79706


Corporate Office:

21 Waterway Ave, Suite 300,

The Woodlands, TX 77380

info@parpalco.com


+1 (432) 214-2442


Copyright © PARPAL LLC - Powered by Framer

Let's Work Together - Construktion X Framer Template

Let’s Work Together
Build with a Team Focused on Speed, Precision, and Execution.

Delivering Practical Solutions to Complex Projects

Where Engineering Meets Construction

Contact

Headquarters:

6817 W County Rd 107,

Midland, TX 79706


Corporate Office:

21 Waterway Ave, Suite 300,

The Woodlands, TX 77380

info@parpalco.com


+1 (432) 214-2442


Copyright © PARPAL LLC - Powered by Framer